Shiraz Third Ammonia & Urea Utility
Plant
|
|
| |
Client: |
|
NPC |
|
|
| |
Project type:
|
|
Turn Key |
|
|
|
|
Scope of
Work: |
|
|
PBasic
Engineering |
|
PDetail
Engineering |
|
PLocal
& Foreign Procurement |
|
PConstruction |
|
PCommissioning |
|
PTraining
Management |
|
PSupervision
and Technical |
|
|
| |
Brief
description: |
|
PProduction
Plants Capacity:
Water Treatment System 1500
m3/hr
RO Desalination Plant 750 m3/hr
Open Circulating Cooling System 35,000 m3/hr
Dm Water Production Plant 500 m3/hr
Instrument, Plant Air 4000 m3/hr
Nitrogen Generation 2400 m3/hr
Portable Water 10m3/hr |
|
|
| |
EPC
Contractor:
|
|
(Hirbodan / Metatech
/ Hico) Consortium |
|
|
| |
Location: |
|
Shiraz - Iran |
|
|
| |
Project Period:
|
|
24 Months |
|
|
|
 |
|