Neka Power Plant / Main and Aux. Cooling System
      First Once Through Cooling System Project,to be Performed by an Iranian Company
 
  Client:   MAPNA    
  Project type:   Lump Sum Turn Key (LSTK)    
  Scope of Work:  
PBasic Design
PDetail Engineering
PProcurement
PConstruction
PPre-Commissioning
   
  Brief description:  
PMain Cooling: once through cooling
  system (Q=19000 m3/hr) including
  screen system, pumps, piping and surface
  condenser
PAuxiliary Cooling: once through cooling
  system (Q=450 m3/hr) including screen
  system and plate type heat exchanger
  and auxiliary cooling pumps.
 
  Location:   Neka - Iran    
  Project Period:   18 Months    