Neka
Power Plant / Main and Aux. Cooling System
First Once Through Cooling System Project,to be Performed by an Iranian
Company
|
| |
Client: |
|
MAPNA |
|
|
| |
Project
type:
|
|
Lump Sum Turn Key (LSTK) |
|
|
|
|
Scope of
Work: |
|
|
PBasic
Design |
|
PDetail
Engineering |
|
PProcurement |
|
PConstruction |
|
PPre-Commissioning |
|
|
|
| |
Brief
description: |
|
PMain
Cooling: once through cooling
system (Q=19000 m3/hr) including
screen system, pumps, piping and surface
condenser |
PAuxiliary
Cooling: once through cooling
system (Q=450 m3/hr) including screen
system and plate type heat exchanger
and auxiliary cooling pumps. |
|
|
| |
Location: |
|
Neka - Iran |
|
|
| |
Project Period:
|
|
18 Months |
|
|
|