MWA Transmission Temporary Power to south Pars
Phases 6,7&8
|
|
| |
Client: |
|
Petropars LTD. CO. / Pars
Oil and Gas. Co. |
|
|
| |
Project type:
|
|
Lump Sum Turn Key (LSTK) |
|
|
|
|
Scope of
Work: |
|
|
PDetail
Engineering |
|
PLocal
and Foreign Procurement |
|
PConstruction |
|
PCommissioning |
|
PPerformance
tests |
|
|
|
| |
Brief
description: |
|
PTransmission
of 100 MVA, 132 KV redundant
electrical power on the EPC basis including 6.5 Km
cable trenches and two 100 MWA step down 132/33
KV transformers. |
|
|
| |
Location: |
|
Assaluyeh - Iran |
|
|
| |
Project Period:
|
|
8 Months |
|
|
|